1. Confirm readiness
Check utilities, access, property information, selected package, provided drawings and the tools authorised for the job.
A reliable inspection method makes the work traceable from the booked scope to the homeowner's next decision.
DPM's inspection methodology is the controlled sequence used to prepare the site, assign scope, perform authorised checks, capture evidence, reconcile team coverage and communicate the current observable condition.
The sequence protects both coverage and clarity. It also stops a checklist from being treated as permission for work outside the booked scope or inspector's competence.
Check utilities, access, property information, selected package, provided drawings and the tools authorised for the job.
The Site PIC assigns categories or zones so each part of the confirmed scope has a named owner.
Inspectors work item by item in a sequence suited to the home, safety conditions and any monitored tests.
The record identifies the location, observable condition, method where relevant and any limit encountered.
Completed checks, unchecked areas and important findings are reviewed before leaving the site.
The homeowner receives a clear explanation of key findings, limitations, priority actions and expected next steps.
Identify the property area, room, surface, fitting or system involved.
Describe the visible or measured condition without guessing at a concealed cause.
Capture a useful overview, detail image, reading or comparison when authorised and relevant.
Record access, test and method limitations so an unchecked item is never read as a pass.
Method controls used across the field workflow
See a property-matched price first. Contact details are requested only after you choose an option.
Get Instant QuoteNo. DPM uses property-matched landed and high-rise references. Only applicable, accessible checks within the confirmed package are performed.
Named ownership helps prevent gaps and duplicate work. Cross-checking supports the scope owner but does not replace their responsibility.
No. The method, scope, equipment, site condition and competent person must support the test. Otherwise the limitation is recorded or the item is referred.
The area or test limitation should be recorded. It is not marked as checked, passed or defect-free.
A concern that may create immediate safety or property risk is escalated promptly instead of waiting for the final report cycle.
No phone number is needed to view the available price.
Get My Instant Quote