Map what will be hidden
Identify services, supports, waterproofing, interfaces, substrates and records that will become inaccessible.
Preserve the evidence while important interfaces are still visible and correction remains practical.
A concealed-work checkpoint is planned from the approved scope and construction sequence before work begins. It records the relevant materials, routes, junctions, tests and unresolved points before ceilings, walls, floors or finishes make them inaccessible.
The checkpoint plan should match consequence, repair difficulty and the evidence required after handover.
Identify services, supports, waterproofing, interfaces, substrates and records that will become inaccessible.
Check applicable authority, management, professional and competent-person requirements before treating work as authorised.
State the location, notice period, required evidence and person authorised to release the next stage.
Record product identity, model, batch, approved substitution, warranty and intended location where relevant.
Photograph room orientation, routes, junctions and close details with dates and useful location labels.
Arrange the authorised water, electrical, pressure, waterproofing, drainage or other applicable test before closure.
Assign repair, evidence and reinspection requirements before allowing incomplete or untested work to be covered.
Store drawings, marked-up routes, photographs, tests, approvals, variations and release notes for future decisions.
Identify concealed elements and their required evidence before work starts.
Use written hold points so the right reviewer sees the work at the right stage.
Record visible condition, materials, tests, approvals and unresolved points.
Allow closure only through the agreed authority and preserve the final concealed-work record.
Your concealed-work checkpoint record
See a property-matched price first. Contact details are requested only after you choose an option.
Get Instant QuoteIt depends on the approved design and work sequence. Common checkpoints involve services, supports, waterproofing, substrates, interfaces and required tests.
No. They preserve visible context but do not replace the applicable test, approval, certification or competent-person decision.
No. These decisions require the appropriate appointed professional or competent party.
Record the evidence gap. The next action may involve documents, specialist review or authorised opening-up work, depending on consequence and contract.
No. Prioritise according to consequence, approved scope, required test, repair difficulty and the evidence needed after handover.
No phone number is needed to view the available price.
Get My Instant Quote