Confirm the unit details
Share the development, block, level, unit, approximate size, selected service and any duplex level, private yard, terrace or restricted area.
Prepare more than the front-door key so avoidable access and utility gaps do not reduce the inspection you arranged.
A high-rise inspection depends on parking registration, access cards, lift rules, management permission, utilities and a clear boundary between the unit and shared building areas. Readiness reduces avoidable Not Checked items without creating authority over common property.
The sequence prevents access, utility and management requirements from becoming avoidable inspection limitations.
Share the development, block, level, unit, approximate size, selected service and any duplex level, private yard, terrace or restricted area.
Ask whether the inspector, vehicle, identification, appointment time, service lift or work permit must be registered.
Confirm the permitted entrance, parking location, keys and cards needed for the unit and agreed areas.
Confirm water, electricity, meter and isolation status before the visit. Missing utilities may leave applicable items Not Checked.
Provide reasonable access to rooms, balconies, wet areas, fittings, doors, windows and service points within scope.
Facade, common roof, corridors, risers, plant rooms, other parcels and management-controlled areas need separate authority and scope.
Keep the floor plan, handover documents, developer instructions, earlier reports, repair history and relevant management notices.
Allow time for the handover explanation, management sign-out, card return and parking or loading deadlines.
Share the property, service, size, special areas and known concerns.
Complete management registration, parking and access arrangements.
Make utilities, rooms, documents, keys and cards available.
Keep unit, common-property and restricted-area boundaries explicit.
What to prepare before the inspection team arrives
See a property-matched price first. Contact details are requested only after you choose an option.
Get Instant QuoteFollow the requirements that apply to the building. Some developments require prior registration, identification or service-access arrangements.
They are required for applicable checks that depend on those utilities. Without them, affected items may be Not Checked or require follow-up.
No. Common-property and restricted-area access require the appropriate authority and separately confirmed purpose, scope and safety arrangements.
Record the limitation before or during the visit. An inaccessible area cannot be treated as inspected or passed.
Only under a confirmed arrangement that complies with the property and management process. Keys, cards, authorisation and handover responsibility must be clear.
No phone number is needed to view the available price.
Get My Instant Quote